03-22-2021, 12:53 AM
http://imgur.com/a/DiX8ROH
Some photos of the barn. 40x60 overall. 22x22 shop, utility room, office, bathroom and a location for a walk in cooler.
Electrical rough in is almost done.
Concrete out front in roughly two weeks. Then final driveway.
Once i get those items checked and part of the interior walls sheeted, I'll get spray foam on those and the entire exterior walls. Blown in above the ceiling in the shop area and the liner panel.
Interior of the barn gets finished with a liner panel to 8'. Shop side will get all drywall.
Slow process only working on it one day a week. Hope to be done in time to move in per se in the fall
Some photos of the barn. 40x60 overall. 22x22 shop, utility room, office, bathroom and a location for a walk in cooler.
Electrical rough in is almost done.
Concrete out front in roughly two weeks. Then final driveway.
Once i get those items checked and part of the interior walls sheeted, I'll get spray foam on those and the entire exterior walls. Blown in above the ceiling in the shop area and the liner panel.
Interior of the barn gets finished with a liner panel to 8'. Shop side will get all drywall.
Slow process only working on it one day a week. Hope to be done in time to move in per se in the fall